Richard Martin Lusby
Richard Martin Lusby
Associate Professor, Management Science, DTU Management Engineering, Technical University of
Verified email at dtu.dk
Title
Cited by
Cited by
Year
Railway track allocation: models and methods
RM Lusby, J Larsen, M Ehrgott, D Ryan
OR spectrum 33 (4), 843-883, 2011
2762011
Models for the discrete berth allocation problem: A computational comparison
K Buhrkal, S Zuglian, S Ropke, J Larsen, R Lusby
Transportation Research Part E: Logistics and Transportation Review 47 (4 …, 2011
1682011
A set packing inspired method for real-time junction train routing
RM Lusby, J Larsen, M Ehrgott, DM Ryan
Computers & Operations Research 40 (3), 713-724, 2013
722013
A survey on robustness in railway planning
RM Lusby, J Larsen, S Bull
European Journal of Operational Research 266 (1), 1-15, 2018
462018
Routing trains through railway junctions: a new set-packing approach
R Lusby, J Larsen, D Ryan, M Ehrgott
Transportation Science 45 (2), 228-245, 2011
452011
An exact method for the double TSP with multiple stacks
RM Lusby, J Larsen, M Ehrgott, D Ryan
International Transactions in Operational Research 17 (5), 637-652, 2010
402010
Integrating robust timetabling in line plan optimization for railway systems
S Burggraeve, SH Bull, P Vansteenwegen, RM Lusby
Transportation Research Part C: Emerging Technologies 77, 134-160, 2017
362017
A column generation approach for solving the patient admission scheduling problem
TM Range, RM Lusby, J Larsen
European Journal of Operational Research 235 (1), 252-264, 2014
322014
Tramp ship routing and scheduling with integrated bunker optimization
C Vilhelmsen, R Lusby, J Larsen
EURO Journal on Transportation and Logistics 3 (2), 143-175, 2014
252014
A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system
R Lusby, LF Muller, B Petersen
Journal of Scheduling 16 (6), 605-628, 2013
252013
A hybrid column generation approach for an industrial waste collection routing problem
K Hauge, J Larsen, RM Lusby, E Krapper
Computers & Industrial Engineering 71, 10-20, 2014
242014
Routing trains through railway junctions: A new set packing approach
R Lusby, J Larsen, D Ryan, M Ehrgott
Informatics and Mathematical Modelling, Technical University of Denmark, DTU, 2006
212006
A Branch-and-Price algorithm for railway rolling stock rescheduling
RM Lusby, JT Haahr, J Larsen, D Pisinger
Transportation Research Part B: Methodological 99, 228-250, 2017
192017
An adaptive large neighborhood search procedure applied to the dynamic patient admission scheduling problem
RM Lusby, M Schwierz, TM Range, J Larsen
Artificial intelligence in medicine 74, 21-31, 2016
192016
Integrating rolling stock scheduling with train unit shunting
J Haahr, RM Lusby
European Journal of Operational Research 259 (2), 452-468, 2017
172017
A column generation-based heuristic for rostering with work patterns
R Lusby, A Dohn, TM Range, J Larsen
Journal of the Operational Research Society 63 (2), 261-277, 2012
172012
Optimization methods for the train unit shunting problem
JT Haahr, RM Lusby, JC Wagenaar
European Journal of Operational Research 262 (3), 981-995, 2017
132017
A branch-and-price framework for railway rolling stock rescheduling during disruptions
JT Haahr, RM Lusby, J Larsen, D Pisinger
DTU Management Engineering, 2014
132014
Tramp ship routing and scheduling with voyage separation requirements
C Vilhelmsen, RM Lusby, J Larsen
OR Spectrum 39 (4), 913-943, 2017
122017
A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards
JT Haahr, RM Lusby
Networks 67 (2), 126-138, 2016
122016
The system can't perform the operation now. Try again later.
Articles 1–20