Følg
Mette Gamst
Mette Gamst
Energinet
Verificeret mail på energinet.dk
Titel
Citeret af
Citeret af
År
A branch-and-price algorithm for the long-term home care scheduling problem
M Gamst, TS Jensen
Operations Research Proceedings 2011: Selected Papers of the International …, 2012
442012
Compensating active power imbalances in power system with large-scale wind power penetration
A Basit, AD Hansen, M Altin, PE Sørensen, M Gamst
Journal of Modern Power Systems and Clean Energy 4 (2), 229-237, 2016
302016
Two-and three-index formulations of the minimum cost multicommodity k-splittable flow problem
M Gamst, PN Jensen, D Pisinger, C Plum
European Journal of Operational Research 202 (1), 82-89, 2010
262010
A comparative study of time aggregation techniques in relation to power capacity expansion modeling
S Buchholz, M Gamst, D Pisinger
Top 27, 353-405, 2019
202019
Wind power integration into the automatic generation control of power systems with large‐scale wind power
A Basit, AD Hansen, M Altin, P Sørensen, M Gamst
The Journal of Engineering 2014 (10), 538-545, 2014
192014
Sensitivity analysis of time aggregation techniques applied to capacity expansion energy system models
S Buchholz, M Gamst, D Pisinger
Applied Energy 269, 114938, 2020
152020
Comparing branch-and-price algorithms for the Multi-Commodity k-splittable Maximum Flow Problem
M Gamst, B Petersen
European Journal of Operational Research 217 (2), 278-286, 2012
142012
A local search heuristic for the Multi-Commodity-splittable Maximum Flow Problem
M Gamst
Optimization Letters 8 (3), 919-937, 2014
82014
Finding a portfolio of near-optimal aggregated solutions to capacity expansion energy system models
S Buchholz, M Gamst, D Pisinger
SN Operations Research Forum 1, 1-40, 2020
72020
Decision support for the technician routing and scheduling problem
M Gamst, D Pisinger
Networks 83 (1), 169-196, 2024
42024
Time aggregation techniques applied to a capacity expansion model for real-life sector coupled energy systems
M Gamst, S Buchholz, D Pisinger
arXiv preprint arXiv:2012.10244, 2020
42020
A decomposition based on path sets for the Multi-Commodity k-splittable Maximum Flow Problem
M Gamst
DTU Management Engineering, 2013
42013
Exact and heuristic solution approaches for the integrated job scheduling and constrained network routing problem
M Gamst
Discrete Applied Mathematics 164, 121-137, 2014
32014
A survey of the Routing and Wavelength Assignment Problem
M Gamst
DTU Management, 2009
32009
Integrated job scheduling and network routing
M Gamst, D Pisinger
Networks 61 (3), 248-262, 2013
22013
An exact approach for aggregated formulations
M Gamst, S Spoorendonk
21st International Symposium on Mathematical Programming, 2012
22012
Long-term home care scheduling
M Gamst, TS Jensen
DTU Management, 2011
22011
Greedy and metaheuristics for the offline scheduling problem in grid computing
M Gamst
DTU Management, 2010
22010
Exact and heuristic methods for the split delivery vehicle routing problem
M Gamst, RM Lusby, S Ropke
Transportation Science 58 (4), 741-760, 2024
12024
Simultaneously exploiting two formulations: An exact benders decomposition approach
RM Lusby, M Gamst, S Ropke, S Spoorendonk
Computers & Operations Research 123, 105041, 2020
12020
Systemet kan ikke foretage handlingen nu. Prøv igen senere.
Artikler 1–20