Laurent Flindt Muller
Laurent Flindt Muller
Unknown affiliation
Verified email at diku.dk
TitleCited byYear
A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times
LF Muller, S Spoorendonk, D Pisinger
European Journal of Operational Research 218 (3), 614-623, 2012
542012
Fast and compact oracles for approximate distances in planar graphs
LF Muller, M Zachariasen
European Symposium on Algorithms, 657-668, 2007
252007
An adaptive large neighborhood search algorithm for the resource-constrained project scheduling problem
LF Muller
MIC 2009: The VIII Metaheuristics international conference, 2009
232009
A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system
R Lusby, LF Muller, B Petersen
Journal of Scheduling 16 (6), 605-628, 2013
222013
An adaptive large neighborhood search algorithm for the multi-mode RCPSP
LF Muller
DTU Management, 2011
82011
An adaptive large neighborhood search algorithm for the multi-mode resouceconstrained project scheduling problem
LF Muller
Technical report, Department of Management Engineering, Technical University …, 2011
72011
A hybrid adaptive large neighborhood search algorithm applied to a lot-sizing problem
LF Muller, S Spoorendonk
DTU Management, 2010
62010
Separation and extension of cover inequalities for conic quadratic knapsack constraints with generalized upper bounds
A Atamtürk, LF Muller, D Pisinger
INFORMS Journal on Computing 25 (3), 420-431, 2013
52013
A solution approach to the ROADEF/EURO 2010 challenge based on Benders' Decomposition
RM Lusby, LF Muller, B Petersen
DTU Management, 2010
52010
A Multi-mode Resource-Constrained Project Scheduling Problem with Stochastic Nonrenewable Resource Consumption,‖ DTU Management Engineering, Lyngby
LF Muller
Denmark, Technical Report, 2011
42011
Separation and extension of cover inequalities for secondorder conic knapsack constraints with generalized upper bounds
A Atamtürk, LF Muller, D Pisinger
Technical report, Department of Management Engineering, Technical University …, 2011
42011
Robust long-term production planning
LF Muller, D Pisinger
Technical University of Denmark (DTU), 2011
2011
A Multi-mode RCPSP with Stochas-tic Nonrenewable Resource Con-sumption
LF Muller
2011
A Multi-mode RCPSP with Stochastic Nonrenewable Resource Consumption
LF Muller
DTU Management, 2011
2011
The system can't perform the operation now. Try again later.
Articles 1–14