Mansour Eddaly
Mansour Eddaly
Higher Institute of Business Administration of Gafsa. Tunisia
Verified email at qu.edu.sa
Title
Cited by
Cited by
Year
An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems
B Jarboui, M Eddaly, P Siarry
Computers & Operations Research 36 (9), 2638-2646, 2009
1672009
A hybrid particle swarm optimization algorithm for the redundancy allocation problem
N Beji, B Jarboui, M Eddaly, H Chabchoub
Journal of Computational Science 1 (3), 159-167, 2010
592010
A hybrid genetic algorithm for solving no-wait flowshop scheduling problems
B Jarboui, M Eddaly, P Siarry
The International Journal of Advanced Manufacturing Technology 54 (9-12 …, 2011
512011
Combinatorial particle swarm optimization for solving blocking flowshop scheduling problem
M Eddaly, B Jarboui, P Siarry
Journal of Computational Design and Engineering 3 (4), 295-311, 2016
402016
A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
R Bouabda, B Jarboui, M Eddaly, A Rebaï
Computers & Operations Research 38 (1), 387-393, 2011
272011
A variable neighborhood search algorithm for the capacitated vehicle routing problem
M Amous, S Toumi, B Jarboui, M Eddaly
Electronic Notes in Discrete Mathematics 58, 231-238, 2017
222017
Branch-and-bound algorithm for solving blocking flowshop scheduling problems with makespan criterion
S Toumi, B Jarboui, M Eddaly, A Rebaï
International Journal of Mathematics in Operational Research 10 (1), 34-48, 2017
162017
An estimation of distribution algorithm for minimizing the makespan in blocking flowshop scheduling problems
B Jarboui, M Eddaly, P Siarry, A Rebaï
Computational Intelligence in Flow Shop and Job Shop Scheduling, 151-167, 2009
72009
Variable neighborhood formulation search approach for the multi-item capacitated lot-sizing problem with time windows and setup times
R Erromdhani, B Jarboui, M Eddaly, A Rebai, N MLADENOVIC
Yugoslav Journal of Operations Research 27 (3), 301-322, 2017
52017
Hierarchical production planning with flexibility in agroalimentary environment: a case study
R Erromdhani, M Eddaly, A Rebai
Journal of Intelligent Manufacturing 23 (3), 811-819, 2012
52012
Hybrid estimation of distribution algorithm for permutation flowshop scheduling problem with sequence dependent family setup times
M Eddaly, B Jarboui, R Bouabda, A Rebai
2009 International Conference on Computers & Industrial Engineering, 217-220, 2009
52009
Lower bounds on the total tardiness and total weighted tardiness for scheduling flowshop with blocking
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Advanced Logistics and Transport, 296-301, 2013
42013
Variable neighborhood search algorithms for the permutation flowshop scheduling problem with the preventive maintenance
W Jomaa, M Eddaly, B Jarboui
Operational Research, 1-18, 2019
32019
Branch and bound algorithm for solving blocking flowshop scheduling problem with total tardiness and total weighted tardiness criteria
S Toumi, B Jarboui, M Eddaly, A Rebaï
International Journal of Operational Research 30 (4), 441-459, 2017
32017
An efficient Branch and Bound algorithm to solve the permutation flowshop scheduling problem with blocking constraints
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 5th International Conference on Modeling, Simulation and Applied …, 2013
32013
Solving blocking flowshop scheduling problem with branch and bound algorithm
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Advanced Logistics and Transport, 411-416, 2013
22013
Branch and Bound algorithm for solving blocking flowshop scheduling problem with total tardiness
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Control, Decision and Information …, 2013
22013
Branch and bound algorithm for solving blocking flowshop scheduling problem with total completion time
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 International Conference on Control, Decision and Information …, 2013
22013
New lower bounds for the blocking flowshop scheduling problem to minimize the total completion time criterion
S Toumi, B Jarboui, M Eddaly, A Rebaï
2013 5th International Conference on Modeling, Simulation and Applied …, 2013
22013
An Estimation of Distribution Algorithm for Solving Flow Shop Scheduling Problems with Sequence‐dependent Family Setup Times
M Eddaly, B Jarboui, R Bouabda, P Siarry, A Rebaï
Metaheuristics for production scheduling, 1-17, 2013
12013
The system can't perform the operation now. Try again later.
Articles 1–20