Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring J Teizer, H Neve, H Li, S Wandahl, J König, B Ochner, M König, J Lerche Automation in Construction 116, 103245, 2020 | 62 | 2020 |
Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights HH Neve, S Wandahl, S Lindhard, J Teizer, J Lerche Journal of Construction Engineering and Management 146 (9), 04020110, 2020 | 58 | 2020 |
Application of last planner system to modular offshore wind construction J Lerche, HH Neve, G Ballard, J Teizer, S Wandahl, A Gross Journal of construction engineering and management 146 (11), 05020015, 2020 | 39 | 2020 |
Learning to see value-adding and non-value-adding work time in renovation production systems H Neve, S Wandahl, S Lindhard, J Teizer, J Lerche Production planning & control 33 (8), 790-802, 2022 | 32 | 2022 |
Application of Takt and Kanban to modular wind turbine construction J Lerche, P Enevoldsen, O Seppänen Journal of Construction Engineering and Management 148 (2), 05021015, 2022 | 30 | 2022 |
Continuous Improvements at Operator Level. J Lerche, H Neve, S Wandahl, A Gross Journal of Engineering, Project & Production Management 10 (1), 2020 | 30 | 2020 |
What a waste of time S Wandahl, HH Neve, J Lerche Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC …, 2021 | 21 | 2021 |
Lessons for construction: Delivering mega project on time through culture and Hoshin Kanri S Leth, J Lerche, HH Neve, S Wandahl Proc. 27th Annual Conference of the International. Group for Lean …, 2019 | 16 | 2019 |
Why would location-based scheduling be applicable for offshore wind turbine construction? J Lerche, O Seppänen, KB Pedersen, HH Neve, S Wandahl, A Gross Proceedings of the 27th Annual Conference of the International Group for …, 2019 | 15 | 2019 |
Causes of delay in offshore wind turbine construction projects J Lerche, S Lindhard, P Enevoldsen, HH Neve, DE Møller, EL Jacobsen, ... Production Planning & Control 34 (15), 1513-1526, 2023 | 14 | 2023 |
The impact of COVID-19 on offshore wind project productivity–A case study J Lerche, S Lorentzen, P Enevoldsen, HH Neve Renewable and Sustainable Energy Reviews 158, 112188, 2022 | 13 | 2022 |
The impact of construction labour productivity on the renovation wave S Wandahl, CT Perez, S Salling, HH Neve, J Lerche, S Petersen Construction Economics and Building 21 (3), 11-32, 2021 | 12 | 2021 |
Combining lean methods to improve construction labour efficiency in renovation projects HH Neve, J Lerche, S Wandahl Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC …, 2021 | 12 | 2021 |
Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction? J Lerche, H Neve, KB Pedersen, S Wandahl, A Gross In:, Proc. 29th Annual Conference of the International Group for Lean …, 2019 | 9* | 2019 |
Robustness of work sampling for measuring time waste S Wandahl, CT Pérez, S Salling, J Lerche Proc. 30th Annual Conference of the International Group for Lean …, 2022 | 8 | 2022 |
What can be learned from variability in offshore wind projects J Lerche, S Lindhard, P Enevoldsen, A Velaayudan, J Teizer, HH Neve, ... Energy Strategy Reviews 39, 100794, 2022 | 6 | 2022 |
Offshore wind project production system: Reducing construction duration through planning J Lerche Aarhus BSS, School of Business and Social Sciences, Aarhus University, 2020 | 6 | 2020 |
Combining Takt and Deming Cycles at Operator Level—Practical Study J Lerche, HH Neve, S Wandahl, A Gross The 10th International Conference on Engineering, Project, and Production …, 2020 | 6 | 2020 |
Categorisation of the offshore wind production system J Lerche, H Neve, S Wandahl, A Gross International Journal of Operational Research 43 (3), 299-317, 2022 | 5 | 2022 |
Feedback Loop—The Missing Link in Activity Analysis HH Neve, S Wandahl, J Lerche The 10th International Conference on Engineering, Project, and Production …, 2020 | 4 | 2020 |