Follow
Jon Lerche
Title
Cited by
Cited by
Year
Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring
J Teizer, H Neve, H Li, S Wandahl, J König, B Ochner, M König, J Lerche
Automation in Construction 116, 103245, 2020
622020
Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights
HH Neve, S Wandahl, S Lindhard, J Teizer, J Lerche
Journal of Construction Engineering and Management 146 (9), 04020110, 2020
582020
Application of last planner system to modular offshore wind construction
J Lerche, HH Neve, G Ballard, J Teizer, S Wandahl, A Gross
Journal of construction engineering and management 146 (11), 05020015, 2020
392020
Learning to see value-adding and non-value-adding work time in renovation production systems
H Neve, S Wandahl, S Lindhard, J Teizer, J Lerche
Production planning & control 33 (8), 790-802, 2022
322022
Application of Takt and Kanban to modular wind turbine construction
J Lerche, P Enevoldsen, O Seppänen
Journal of Construction Engineering and Management 148 (2), 05021015, 2022
302022
Continuous Improvements at Operator Level.
J Lerche, H Neve, S Wandahl, A Gross
Journal of Engineering, Project & Production Management 10 (1), 2020
302020
What a waste of time
S Wandahl, HH Neve, J Lerche
Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC …, 2021
212021
Lessons for construction: Delivering mega project on time through culture and Hoshin Kanri
S Leth, J Lerche, HH Neve, S Wandahl
Proc. 27th Annual Conference of the International. Group for Lean …, 2019
162019
Why would location-based scheduling be applicable for offshore wind turbine construction?
J Lerche, O Seppänen, KB Pedersen, HH Neve, S Wandahl, A Gross
Proceedings of the 27th Annual Conference of the International Group for …, 2019
152019
Causes of delay in offshore wind turbine construction projects
J Lerche, S Lindhard, P Enevoldsen, HH Neve, DE Møller, EL Jacobsen, ...
Production Planning & Control 34 (15), 1513-1526, 2023
142023
The impact of COVID-19 on offshore wind project productivity–A case study
J Lerche, S Lorentzen, P Enevoldsen, HH Neve
Renewable and Sustainable Energy Reviews 158, 112188, 2022
132022
The impact of construction labour productivity on the renovation wave
S Wandahl, CT Perez, S Salling, HH Neve, J Lerche, S Petersen
Construction Economics and Building 21 (3), 11-32, 2021
122021
Combining lean methods to improve construction labour efficiency in renovation projects
HH Neve, J Lerche, S Wandahl
Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC …, 2021
122021
Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?
J Lerche, H Neve, KB Pedersen, S Wandahl, A Gross
In:, Proc. 29th Annual Conference of the International Group for Lean …, 2019
9*2019
Robustness of work sampling for measuring time waste
S Wandahl, CT Pérez, S Salling, J Lerche
Proc. 30th Annual Conference of the International Group for Lean …, 2022
82022
What can be learned from variability in offshore wind projects
J Lerche, S Lindhard, P Enevoldsen, A Velaayudan, J Teizer, HH Neve, ...
Energy Strategy Reviews 39, 100794, 2022
62022
Offshore wind project production system: Reducing construction duration through planning
J Lerche
Aarhus BSS, School of Business and Social Sciences, Aarhus University, 2020
62020
Combining Takt and Deming Cycles at Operator Level—Practical Study
J Lerche, HH Neve, S Wandahl, A Gross
The 10th International Conference on Engineering, Project, and Production …, 2020
62020
Categorisation of the offshore wind production system
J Lerche, H Neve, S Wandahl, A Gross
International Journal of Operational Research 43 (3), 299-317, 2022
52022
Feedback Loop—The Missing Link in Activity Analysis
HH Neve, S Wandahl, J Lerche
The 10th International Conference on Engineering, Project, and Production …, 2020
42020
The system can't perform the operation now. Try again later.
Articles 1–20