Follow
Pedro Luis González Rodríguez
Pedro Luis González Rodríguez
Verified email at us.es
Title
Cited by
Cited by
Year
The CONWIP production control system: review and research issues
JM Framinan, PL González, R Ruiz-Usano
Production Planning & Control 14 (3), 255-265, 2003
2432003
Truck-drone team logistics: A heuristic approach to multi-drop route planning
PL Gonzalez-R, D Canca, JL Andrade-Pineda, M Calle, JM Leon-Blanco
Transportation Research Part C: Emerging Technologies 114, 657-680, 2020
1572020
Application of statistical experimental design to study the formulation variables influencing the coating process of lidocaine liposomes
ML Gonzalez-Rodriguez, LB Barros, J Palma, PL González-Rodríguez, ...
International journal of pharmaceutics 337 (1-2), 336-345, 2007
1062007
Dynamic card controlling in a Conwip system
JM Framinan, PL Gonzalez, R Ruiz-Usano
International Journal of Production Economics 99 (1-2), 102-116, 2006
922006
Token-based pull production control systems: an introductory overview
PL González-r, JM Framinan, H Pierreval
Journal of Intelligent Manufacturing 23, 5-22, 2012
672012
Scheduling a dual-resource flexible job shop with makespan and due date-related criteria
JL Andrade-Pineda, D Canca, PL Gonzalez-R, M Calle
Annals of operations research 291, 5-35, 2020
542020
Deformability properties of timolol-loaded transfersomes based on the extrusion mechanism. Statistical optimization of the process
ML González-Rodríguez, CM Arroyo, MJ Cózar-Bernal, PL González-R, ...
Drug development and industrial pharmacy 42 (10), 1683-1694, 2016
522016
A multi-agent approach to the truck multi-drone routing problem
JM Leon-Blanco, PL Gonzalez-R, JL Andrade-Pineda, D Canca, M Calle
Expert Systems with Applications 195, 116604, 2022
392022
Integrated management of inventory and production systems based on floating decoupling point and real-time information: A simulation based analysis
M Calle, PL González-R, JM Leon, H Pierreval, D Canca
International Journal of Production Economics 181, 48-57, 2016
372016
A methodology for the design and operation of pull‐based supply chains
PL González‐R, JM Framinan, R Ruiz‐Usano
Journal of Manufacturing Technology Management 24 (3), 307-330, 2013
282013
A multi-objective comparison of dispatching rules in a drum–buffer–rope production control system
PL Gonzalez-R, JM Framinan, R Ruiz-Usano
International Journal of Computer Integrated Manufacturing 23 (2), 155-167, 2010
252010
A response surface methodology for parameter setting in a dynamic Conwip production control system
PL González-R, JM Framinan, R Ruiz-Usano
International Journal of Manufacturing Technology and Management 23 (1-2), 16-33, 2011
192011
On modelling non-linear quantity discounts in a supplier selection problem by mixed linear integer optimization
JL Andrade-Pineda, D Canca, PL Gonzalez-R
Annals of Operations Research 258, 301-346, 2017
182017
The pull evolution: from Kanban to customised token-based systems
PL González-R, JM Framinan
Production Planning and Control 20 (3), 276-287, 2009
182009
Job shop management of products under internal lifespan and external due date
PL Gonzalez-R, M Calle, JL Andrade-Pineda
International Journal of Production Research 56 (16), 5457-5474, 2018
172018
Robust optimization of alginate-carbopol 940 bead formulations
JM López-Cacho, PL González-R, B Talero, AM Rabasco, ...
The Scientific World Journal 2012, 2012
172012
A methodology for schedule‐based paths recommendation in multimodal public transportation networks
D Canca, A Zarzo, PL González‐R, E Barrena, E Algaba
Journal of Advanced Transportation 47 (3), 319-335, 2013
162013
Production management: Advanced models, tools, and applications for pull systems
Y Khojasteh
Taylor & Francis, 2017
152017
A mathematical modeling approach to optimize composite parts placement in autoclave
M Dios, PL Gonzalez‐R, D Dios, A Maffezzoli
International Transactions in Operational Research 24 (1-2), 115-141, 2017
132017
Research study of factors affecting difference between hole diameters in hybrid metal-composite drilling
R Carvajal, PL González-R, S Lozano
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2011
132011
The system can't perform the operation now. Try again later.
Articles 1–20