Follow
Majid Ataee-pour
Title
Cited by
Cited by
Year
Development of a model to predict peak particle velocity in a blasting operation
H Dehghani, M Ataee-Pour
International Journal of Rock Mechanics and Mining Sciences 48 (1), 51-58, 2011
1392011
Integration of sustainable development concepts in open pit mine design
N Adibi, M Ataee-pour, M Rahmanpour
Journal of Cleaner Production 108, 1037-1049, 2015
792015
A critical survey of the existing stope layout optimization techniques
M Ataee-Pour
Journal of Mining Science 41, 447-466, 2005
722005
Determination of the effect of operating cost uncertainty on mining project evaluation
H Dehghani, M Ataee-Pour
Resources Policy 37 (1), 109-117, 2012
682012
A new model for mining method selection of mineral deposit based on fuzzy decision making
F Samimi Namin, K Shahriar, M Ataee-Pour, H Dehghani
Journal of the Southern African Institute of Mining and Metallurgy 108 (7 …, 2008
642008
A heuristic algorithm to optimise stope boundaries
M Ataee-Pour
512000
Evaluation of the mining projects under economic uncertainties using multidimensional binomial tree
H Dehghani, M Ataee-pour, A Esfahanipour
Resources Policy 39, 124-133, 2014
472014
Optimisation of stope limits using a heuristic approach
M Ataee-Pour
Mining Technology 113 (2), 123-128, 2004
332004
A 3D approximate hybrid algorithm for stope boundary optimization
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian
Computers & Operations Research 115, 104475, 2020
312020
Channel characterization using multiple-point geostatistics, neural network, and modern analogy: A case study from a carbonate reservoir, southwest Iran
S Hashemi, A Javaherian, M Ataee-pour, P Tahmasebi, H Khoshdel
Journal of Applied Geophysics 111, 47-58, 2014
302014
Pit limits optimization using a stochastic process
SE Jalali, M Ataee-Pour, K Shahriar
CIM Magazine 1 (6), 90, 2006
262006
A 2D dynamic programming algorithm to optimize stope boundaries
SE Jalali, M Ataee-Pour
Proceedings of the 13th Symposium on Mine Planning and Equipment Selection …, 2004
262004
Determination of the effect of economic uncertainties on mining project evaluation using Real Option Valuation
H Dehghani, M Ataee-Pour
International Journal of Mining and Mineral Engineering 4 (4), 265-277, 2013
212013
A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Mining Science 50, 1047-1060, 2014
202014
Investigating the impact of gas emission uncertainty on airflow distribution in an auxiliary ventilation system using CFD and Monte-Carlo simulation
S Rahimi, M Ataee-pour, H Madani, SM Aminossadati
Building and Environment 204, 108165, 2021
192021
Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Central South University 21, 2848-2856, 2014
192014
Stope boundary optimization: A mathematical model and efficient heuristics
V Nikbin, M Ataee-pour, K Shahriar, Y Pourrahimian, SA MirHassani
Resources Policy 62, 515-526, 2019
172019
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Gospodarka Surowcami Mineralnymi 30, 2014
172014
A new heuristic algorithm to optimise stope boundaries
M Ataee-Pour
Proceeding of the 2nd Regional APCOM Symposium on Computer Applications in …, 1997
161997
Risk-adjusted discount rate estimation for evaluating mining projects
M Taheri, M Irannajad, M Ataee-Pour
JASSA, 36-42, 2009
152009
The system can't perform the operation now. Try again later.
Articles 1–20