Follow
Emad Elbeltagi
Emad Elbeltagi
Professor of Construction Management, Mansoura University, Egypt
Verified email at mans.edu.eg - Homepage
Title
Cited by
Cited by
Year
Comparison among five evolutionary-based optimization algorithms
E Elbeltagi, T Hegazy, D Grierson
Advanced engineering informatics 19 (1), 43-53, 2005
18382005
A modified shuffled frog-leaping optimization algorithm: applications to project management
E Elbeltagi, T Hegazy, D Grierson
Structure and Infrastructure Engineering 3 (1), 53-60, 2007
2882007
Dynamic layout of construction temporary facilities considering safety
A Eldosouky
Journal of construction engineering and management 130, 534, 2004
2162004
EvoSite: Evolution-based model for site layout planning
T Hegazy, E Elbeltagi
Journal of computing in civil engineering 13 (3), 198-206, 1999
2131999
Comparison of two evolutionary algorithms for optimization of bridge deck repairs
H Elbehairy, E Elbeltagi, T Hegazy, K Soudki
Computer‐Aided Civil and Infrastructure Engineering 21 (8), 561-572, 2006
1822006
A simplified pavement condition index regression model for pavement evaluation
AA Elhadidy, SM El-Badawy, EE Elbeltagi
International Journal of Pavement Engineering 22 (5), 643-652, 2021
1072021
Algorithm for scheduling with multiskilled constrained resources
T Hegazy, AK Shabeeb, E Elbeltagi, T Cheema
Journal of construction engineering and management 126 (6), 414-421, 2000
1062000
A hybrid Al‐based system for site layout planning in construction
E Elbeltagi, T Hegazy
Computer‐Aided Civil and Infrastructure Engineering 16 (2), 79-93, 2001
1022001
Integrated visualized time control system for repetitive construction projects
E Elbeltagi, M Dawood
Automation in Construction 20 (7), 940-953, 2011
972011
Optimum analysis of pavement maintenance using multi-objective genetic algorithms
AA Elhadidy, EE Elbeltagi, MA Ammar
HBRC Journal 11 (1), 107-113, 2015
912015
Distributed scheduling model for infrastructure networks
A Elhakeem
Journal of construction engineering and management 130, 160, 2004
87*2004
Schedule-dependent evolution of site layout planning
E Elbeltagi, T Hegazy, AH Hosny, A Eldosouky
Construction Management and Economics 19 (7), 689-697, 2001
862001
Overall multiobjective optimization of construction projects scheduling using particle swarm
E Elbeltagi, M Ammar, H Sanad, M Kassab
Engineering, Construction and Architectural Management 23 (3), 265-282, 2016
782016
Recent advances of structures monitoring and evaluation using GPS-time series monitoring systems: A review
MR Kaloop, E Elbeltagi, JW Hu, A Elrefai
ISPRS International Journal of Geo-Information 6 (12), 382, 2017
732017
Predicting energy consumption for residential buildings using ANN through parametric modeling
E Elbeltagi, H Wefki
Energy Reports 7, 2534-2545, 2021
722021
Visualized strategy for predicting buildings energy consumption during early design stage using parametric analysis
E Elbeltagi, H Wefki, S Abdrabou, M Dawood, A Ramzy
Journal of Building Engineering 13, 127-136, 2017
722017
Tools of soft computing as applied to the problem of facilities layout planning
F Karray, E Zaneldin, T Hegazy, AHM Shabeeb, E Elbeltagi
IEEE Transactions on Fuzzy Systems 8 (4), 367-379, 2000
702000
Bridge deck management system with integrated life-cycle cost optimization
T Hegazy, E Elbeltagi, H El-Behairy
Transportation Research Record 1866 (1), 44-50, 2004
672004
Talkha steel highway bridge monitoring and movement identification using RTK-GPS technique
MT Elnabwy, MR Kaloop, E Elbeltagi
Measurement 46 (10), 4282-4292, 2013
632013
Sustainable building materials assessment and selection using system dynamics
DG Sahlol, E Elbeltagi, M Elzoughiby, M Abd Elrahman
Journal of Building Engineering 35, 101978, 2021
612021
The system can't perform the operation now. Try again later.
Articles 1–20